CIVIL ENGINEERING (ST/CE) |
Civil Engineering LHC Project
Liste Ouvrage ST Génie Civil
Point 1 Point 1.8 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 TI2 TI8
Description
Point 1 Surface / Souterrain
SCX1
3162
BATIMENT CONTROLE ET BUREAUX
SD15
2155
BATIMENT ( EXISTANT) TETE DE PUITS PM 15
SL14/15
3161
TECHNICAL GALLERY
SX1
3185
BATIMENT TETE DE PUITS PX14 ET PX16
SE1
3160
BATIMENT S/STATION ELECTRIQUE
SGX1
3170
BATIMENT MELANGE GAZ EXPERIENCE
SUX1
3182
BATIMENT VENTILATION ANNEXE
SH1
3184
BATIMENT COMPRESSEUR HELIUM
SDX1
3178
BATIMENT TETE DE PUITS PX 15
SY1
3190
BATIMENT CONTROLE ACCES AU SITE
SEH1
3160
PLATEFORME ELECTRICITE 66kV
RR13
3110
CAVERNE REDRESSEUR VERS PT 8
PX16
3132
PUITS DACCES CAVERNE EXPERIENCE UX15
PX14
3123
PUITS DACCES CAVERNE EXPERIENCE UX15
PM15
2126
PUITS DACCES EXISTANT US15
PX15
2122
PUITS DACCES EXISTANT CAV.USA15
UX15
3126
CAVERNE EXPERIENCE ATLAS
USA15
3125
CAVERNE TECHNIQUE ATLAS
ULX15
3122
GALERIE LIAISON UX15 / PX15
UPX14
3118
GALERIE LIAISON UX15 / USA15
UPX16
3130
GALERIE LIAISON UX15 / USA15
ULX14
3120
GALERIE LIAISON UX15 / USA15
ULX16
3128
GALERIE LIAISON UX15 / USA15
UJ13
3114
CHAMBRE DE JONCTION - EXTENSION UJ14
UJ17
3136
CHAMBRE DE JONCTION - EXTENSION UJ16
UPS14
3116
GALERIE VISEE GEOMETRE VERS UJ13
UPS16
3138
GALERIE VISEE GEOMETRE VERS UJ17
RR17
3141
CAVERNE REDRESSEUR VERS PT 2
Point 1.8 Surface
SMA18
3173
HALL DASSEMBLAGE
SW18
3183
BATIMENT MONTAGE, EAU DEMINERALISEE, CRYO
SD18
2156
DEMOLITION DU SD18 EXISTANT + MOD. BA7-PP7
SD18
3156
BATIMENT DE DECHARGEMENT SUR PM18
SHM18
3177
BATIMENT COMPRESSEUR HELIUM
SL18
3172
TECHNICAL GALLERY
PM18
2145
BLINDAGE UJ18/PM18
SHE18
3364
PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE1
3164
PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE181
3166
PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE182
3167
PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE183
3187
PLATEFORME RESERVOIR HELIUM HORIZONTAL
UJ28
3240
CHAMBRE DE JONCTION
UP25
3229
GALERIE DE LIAISON UL26/UX25
RH23
3218
CAVERNE AIMANT DE REFERENCE VERS PT1
Point 3 Surface
SHE3
3364
PLATEFORME RESERVOIR HELIUM HORIZONTAL
Point 4 Surface
SDH4
3457
BATIMENT UCB 2
SHM4
3477
BATIMENT COMPRESSEUR HELIUM
SL4
3461
TECHNICAL GALLERY
SHE4
3564
PLATEFORME RESERVOIR HELIUM HORIZONTAL
Point 5 Surface / Souterrain
SDX5
3578
BATIMENT TETE DE PUITS PM 54
SF5
3565
TOURS DE REFROIDISSEMENT
SD5
2555
BATIMENT SD EXISTANT
SUX5
3582
BATIMENT VENTILATION EXPERIENCE
SH5
3584
BATIMENT COMPRESSEUR HELIUM
SGX5
3570
BATIMENT MELANGE GAZ EXPERIENCE
SY5
3590
BATIMENT CONTROLE ACCES AU SITE
SCX5
3562
BATIMENT BUREAUX ET LABO CONTROLE
SX5 (5-13)
3585
BATIMENT TETE DE PUITS PX 56
SX5(0-5)
3585
BATIMENT TETE DE PUITS PX 56
PX56
3528
PUITS DACCES CAVERNE EXPERIENCE UXC55
PM54
3521
PUITS DACCES CAVERNE TECHNIQUE USC55
US54
3520
FOND DE PUITS PM54
UX5
3525
CAVERNE EXPERIENCE CMS
UL551
3524
GALERIE TECHNIQUE 1 ENTRE UXC55/USC55
UL552
3524
GALERIE TECHNIQUE 2 ENTRE UXC55/USC55
UL553
3524
GALERIE TECHNIQUE 3 ENTRE UXC55/USC55
USC55
3524
CAVERNE CONTROLE CMS
UJ53
3537
JUNCTIOM CHAMBER - R54 / UL54
UJ57
3537
JUNCTIOM CHAMBER - R56 / UL56
UL54
3535
GALERIE LIAISON CAV.USC55 / MACH. UJ53
UL56
3535
GALERIE LIAISON CAV.USC55 / MACH. UJ57
UL55
3524
GALERIE LIAISON TRAVERSANTE USC 55
UP53
3517
GALERIE LIAISON USC55 / RZ54
UPX56
3524
GALERIE LIAISON CAVERNES UXC55 / USC55
UP56
3533
GALERIE LIAISON UL56 / UJ56
UP55
3519
GALERIE LIAISON US54 / UXC55
UP541
3519
GALERIE LIAISON US54 / UXC55
UJ561
3535
JUNCTIOM CHAMBER UP56 / UP57
TU561
3533
TUNNEL VENTILATION NOUVEAU
RZ54
3517
JUNCTIOM CHAMBER R54 / UP53
PILLAR
3526
PILIER CONTINU ENTRE CAVERNES UXC55 / USC55
PM56
2526
PUITS DACCES EXISTANT SD5 / US56
UJ56
2537
CAV. DE JONCTION - FOND DE PUITS EXIS. PM56
RR53
3508
CAVERNE REDRESSEUR VERS PT 4
RR57
3541
CAVERNE REDRESSEUR VERS PT 6
UPS54
3516
GALERIE VISEE GEOMETRE VERS UJ53
UPS56
3516
GALERIE VISEE GEOMETRE VERS UJ57
UP542
3529
GALERIE DE DRAINAGE PM54/PX56
Point 6 Surface
SHM6
3677
BATIMENT COMPRESSEUR HELIUM
SL6
3661
TECHNICAL GALLERY
SA6
2650
BATIMENT EXISTANT SA - MODIFICATIONS
UJ62
3616
CHAMBRE DE JONCTION VERS PT 5
TD62
3614
TUNNEL BEAM DUMP VERS PT 5
UD62
3612
CAVERNE BEAM DUMP VERS PT 5
UP62
3610
GALERIE LIAISON TUNNEL R62 / CAV.UD62
UJ68
3634
CHAMBRE DE JONCTION VERS PT 7
TD68
3636
TUNNEL BEAM DUMP VERS PT 7
UD68
3638
CAVERNE BEAM DUMP VERS PT 7
UP68
3640
GALERIE LIAISON TUNNEL R68 / CAV.UD68
Point 7 Surface / Souterrain
RR73
TUNNEL ENLARGEMENT
RR77
TUNNEL ENLARGEMENT
SHE7
PLATEFORME RESERVOIR HELIUM HORIZONTALE
Point 8 Surface
SDH8
3857
BATIMENT UCB 2
SHM8
3877
BATIMENT COMPRESSEUR HELIUM
3861
TECHNICAL GALLERY
UJ82
3814
CHAMBRE DE JONCTION
RH87
3837
CAVERNE AIMANT DE REFERENCE VERS PT1
TI2 Area Surface / Souterrain
SDI2
3191
BATIMENT TETE DE PUITS PMI2
SMI2
3191
HALL DE MONTAGE ACIER
PMI2
3149
PUITS DACCES INSERTION AIMANTS PMI2
3145
JONCTION TI2 ET TT60
TI2
3209
INJECTION TUNNEL
UJ22
3214
JUNCTION CHAMBER TI2 / UJ23
TI8 Area Souterrain
UJ88
3840
JUNCTION CHAMBER TI8 / UJ87
TI8/S4
3104
TUNNEL DINJECTION COTE LSS4
TI81
3102
CAVERNE LSS4 ELARGISSEMENT TI8 BLINDAGE
TJ8
3101
JUNCTION CAVERN TI8 / PGC8
PGC8
3107
TI8 SHAFT AT POINT LSS4
TI8
3809
INJECTION TUNNEL TI8
Back to
ST-CE Group Home page.
For comments and changes send e-mail to H.
Masseboeuf
Copyright CERN , modified