CIVIL ENGINEERING (ST/CE)


Civil Engineering LHC Project


Liste Ouvrage ST Génie Civil 

Point 1 Point 1.8 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 TI2 TI8

Sigle Ouvrage
Code Plan Ouvrage
Description
Point 1 Surface / Souterrain
SCX1 3162 BATIMENT CONTROLE ET BUREAUX
SD15 2155 BATIMENT ( EXISTANT) TETE DE PUITS PM 15
SL14/15 3161 TECHNICAL GALLERY
SX1 3185 BATIMENT TETE DE PUITS PX14 ET PX16
SE1 3160 BATIMENT S/STATION ELECTRIQUE
SGX1 3170 BATIMENT MELANGE GAZ EXPERIENCE
SUX1 3182 BATIMENT VENTILATION ANNEXE
SH1 3184 BATIMENT COMPRESSEUR HELIUM
SDX1 3178 BATIMENT TETE DE PUITS PX 15
SY1 3190 BATIMENT CONTROLE ACCES AU SITE
SEH1 3160 PLATEFORME ELECTRICITE 66kV
RR13 3110 CAVERNE REDRESSEUR VERS PT 8
PX16 3132 PUITS D’ACCES CAVERNE EXPERIENCE UX15
PX14 3123 PUITS D’ACCES CAVERNE EXPERIENCE UX15
PM15 2126 PUITS D’ACCES EXISTANT US15
PX15 2122 PUITS D’ACCES EXISTANT CAV.USA15
UX15 3126 CAVERNE EXPERIENCE ATLAS
USA15 3125 CAVERNE TECHNIQUE ATLAS
ULX15 3122 GALERIE LIAISON UX15 / PX15
UPX14 3118 GALERIE LIAISON UX15 / USA15
UPX16 3130 GALERIE LIAISON UX15 / USA15
ULX14 3120 GALERIE LIAISON UX15 / USA15
ULX16 3128 GALERIE LIAISON UX15 / USA15
UJ13 3114 CHAMBRE DE JONCTION - EXTENSION UJ14
UJ17 3136 CHAMBRE DE JONCTION - EXTENSION UJ16
UPS14 3116 GALERIE VISEE GEOMETRE VERS UJ13
UPS16 3138 GALERIE VISEE GEOMETRE VERS UJ17
RR17 3141 CAVERNE REDRESSEUR VERS PT 2
Point 1.8 Surface
SMA18 3173 HALL D’ASSEMBLAGE
SW18 3183 BATIMENT MONTAGE, EAU DEMINERALISEE, CRYO
SD18 2156 DEMOLITION DU SD18 EXISTANT + MOD. BA7-PP7
SD18 3156 BATIMENT DE DECHARGEMENT SUR PM18
SHM18 3177 BATIMENT COMPRESSEUR HELIUM
SL18 3172 TECHNICAL GALLERY
PM18 2145 BLINDAGE UJ18/PM18
SHE18 3364 PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE1 3164 PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE181 3166 PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE182 3167 PLATEFORME RESERVOIR HELIUM HORIZONTAL
SHE183 3187 PLATEFORME RESERVOIR HELIUM HORIZONTAL
UJ28 3240 CHAMBRE DE JONCTION
UP25 3229 GALERIE DE LIAISON UL26/UX25
RH23 3218 CAVERNE AIMANT DE REFERENCE VERS PT1
Point 3 Surface
SHE3 3364 PLATEFORME RESERVOIR HELIUM HORIZONTAL
Point 4 Surface
SDH4 3457 BATIMENT UCB 2
SHM4 3477 BATIMENT COMPRESSEUR HELIUM
 SL4 3461 TECHNICAL GALLERY
 SHE4 3564 PLATEFORME RESERVOIR HELIUM HORIZONTAL
Point 5 Surface / Souterrain
SDX5 3578 BATIMENT TETE DE PUITS PM 54
SF5 3565 TOURS DE REFROIDISSEMENT
SD5 2555 BATIMENT SD EXISTANT
SUX5 3582 BATIMENT VENTILATION EXPERIENCE
SH5 3584 BATIMENT COMPRESSEUR HELIUM
SGX5 3570 BATIMENT MELANGE GAZ EXPERIENCE
SY5 3590 BATIMENT CONTROLE ACCES AU SITE
SCX5 3562 BATIMENT BUREAUX ET LABO CONTROLE
SX5 (5-13) 3585 BATIMENT TETE DE PUITS PX 56
SX5(0-5) 3585 BATIMENT TETE DE PUITS PX 56
PX56 3528 PUITS D’ACCES CAVERNE EXPERIENCE UXC55
PM54 3521 PUITS D’ACCES CAVERNE TECHNIQUE USC55
US54 3520 FOND DE PUITS PM54
UX5 3525 CAVERNE EXPERIENCE CMS
UL551 3524 GALERIE TECHNIQUE 1 ENTRE UXC55/USC55
UL552 3524 GALERIE TECHNIQUE 2 ENTRE UXC55/USC55
UL553 3524 GALERIE TECHNIQUE 3 ENTRE UXC55/USC55
USC55 3524 CAVERNE CONTROLE CMS
UJ53 3537 JUNCTIOM CHAMBER - R54 / UL54
UJ57 3537 JUNCTIOM CHAMBER - R56 / UL56
UL54 3535 GALERIE LIAISON CAV.USC55 / MACH. UJ53
UL56 3535 GALERIE LIAISON CAV.USC55 / MACH. UJ57
UL55 3524 GALERIE LIAISON TRAVERSANTE USC 55
UP53 3517 GALERIE LIAISON USC55 / RZ54
UPX56 3524 GALERIE LIAISON CAVERNES UXC55 / USC55
UP56 3533 GALERIE LIAISON UL56 / UJ56
UP55 3519 GALERIE LIAISON US54 / UXC55
UP541 3519 GALERIE LIAISON US54 / UXC55
UJ561 3535 JUNCTIOM CHAMBER UP56 / UP57
TU561 3533 TUNNEL VENTILATION NOUVEAU
RZ54 3517 JUNCTIOM CHAMBER R54 / UP53
PILLAR 3526 PILIER CONTINU ENTRE CAVERNES UXC55 / USC55
PM56 2526 PUITS D’ACCES EXISTANT SD5 / US56
UJ56 2537 CAV. DE JONCTION - FOND DE PUITS EXIS. PM56
RR53 3508 CAVERNE REDRESSEUR VERS PT 4
RR57 3541 CAVERNE REDRESSEUR VERS PT 6
UPS54 3516 GALERIE VISEE GEOMETRE VERS UJ53
UPS56 3516 GALERIE VISEE GEOMETRE VERS UJ57
UP542 3529 GALERIE DE DRAINAGE PM54/PX56
Point 6 Surface
SHM6 3677 BATIMENT COMPRESSEUR HELIUM
SL6 3661 TECHNICAL GALLERY
SA6 2650 BATIMENT EXISTANT SA - MODIFICATIONS
UJ62 3616 CHAMBRE DE JONCTION VERS PT 5
TD62 3614 TUNNEL BEAM DUMP VERS PT 5
UD62 3612 CAVERNE BEAM DUMP VERS PT 5
UP62 3610 GALERIE LIAISON TUNNEL R62 / CAV.UD62
UJ68 3634 CHAMBRE DE JONCTION VERS PT 7
TD68 3636 TUNNEL BEAM DUMP VERS PT 7
UD68 3638 CAVERNE BEAM DUMP VERS PT 7
UP68 3640 GALERIE LIAISON TUNNEL R68 / CAV.UD68
Point 7 Surface / Souterrain
RR73 TUNNEL ENLARGEMENT
RR77 TUNNEL ENLARGEMENT
SHE7 PLATEFORME RESERVOIR HELIUM HORIZONTALE
Point 8 Surface
SDH8 3857 BATIMENT UCB 2
SHM8 3877 BATIMENT COMPRESSEUR HELIUM
  3861 TECHNICAL GALLERY
UJ82 3814 CHAMBRE DE JONCTION
RH87 3837 CAVERNE AIMANT DE REFERENCE VERS PT1
TI2 Area Surface / Souterrain
SDI2 3191 BATIMENT TETE DE PUITS PMI2
SMI2 3191 HALL DE MONTAGE ACIER
PMI2 3149 PUITS D’ACCES INSERTION AIMANTS PMI2
3145 JONCTION TI2 ET TT60
TI2 3209 INJECTION TUNNEL
UJ22 3214 JUNCTION CHAMBER TI2 / UJ23
TI8 Area Souterrain
UJ88 3840 JUNCTION CHAMBER TI8 / UJ87
TI8/S4 3104 TUNNEL D’INJECTION COTE LSS4
TI81 3102 CAVERNE LSS4 ELARGISSEMENT TI8 BLINDAGE
TJ8 3101 JUNCTION CAVERN TI8 / PGC8
PGC8 3107 TI8 SHAFT AT POINT LSS4
TI8 3809 INJECTION TUNNEL TI8


Back to ST-CE Group Home page.