6th ST Workshop, Thoiry, France (April 1 - April
3, 2003)
List of presented papers
to be found at http://weblib.cern.ch
No. |
Author(s) |
Title |
ST-Note-2003-010 | N. Bangert | Operation and maintenance in the cooling and ventilation group |
ST-Note-2003-011 | G. Cumer | Opératin et maintenance ST-EL : jusqu'où externaliser en conservant la maîtrise ? |
ST-Note-2003-012 | R. Nunes | Operation and maintenance in ST-MA |
ST-Note-2003-013 | O. Boettcher | E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation |
ST-Note-2003-014 | P. Pepinster | Operation and maintenance in the FM Group |
ST-Note-2003-015 | C. Jacot, E. Sanchez-Corral,
L. Symons |
L'avis d'ouverture de chantier informatisé : un moyen de prévention et de management |
ST-Note-2003-016 | C. Colloca | Actions for the environment |
ST-Note-2003-017 | N. Bangert, M. Batz, G.
Cumer, U. Epting, P. Ninin, R. Nunes, J. Pedersen, P. Pepinster, S. Poulsen, T. Riesco, M. Wilhelmsson |
The first year of the ST Operation Committee : is there a future ? |
ST-Note-2003-018 | P. Vojtyla | Interaction of TIS and ST in environmental matters |
ST-Note-2003-019 | M. Pimenta dos Santos | Use of fluorocarbons in the cooling of LHC experiments |
ST-Note-2003-020 | S. Grau, D. Raffourt | Nouvelle technologies appliquées à la sécurité |
ST-Note-2003-021 | D. James | The construction and transport of the ATLAS experiment components |
ST-Note-2003-022 | M. Poehler | Réutilisation des demi-culasses d'aimants dipôles du LEP |
ST-Note-2003-023 | K. Kahle, J. Pedersen T. Larsson, M.M. de Oliveira / ABB |
The new 150 MVAr , 18 kV static var compensator for SPS : background, design and commissioning |
ST-Note-2003-024 | J. Inigo-Golfin, R. Principe | The LHC experiments as seen from the Technical Sector |
ST-Note-2003-025 | C. Martel, B. Pirollet | Organisation des travaux ST-CV |
ST-Note-2003-026 | H. Rammer, J. Osborne | Civil engineering status report for the ATLAS & CMS worksites |
ST-Note-2003-027 | C. Bertone, S. Pelletier | Construction et installation du LHC |
ST-Note-2003-028 | A. Vairo | The organization and on-site follow-up of the electrical installation work for the LHC |
ST-Note-2003-029 | L.A. Lopez Hernandez | Comparaison des procédés d'excavation des tunnels TI8 et TI2 du projet LHC |
ST-Note-2003-030 | J. Pierlot | Modification of the electrical installation in Point 8 |
ST-Note-2003-031 | G. Peon, K.
Dahlerup-Petersen, G.J. Coelingh |
Cooling process of the LHC energy extraction resistors |
ST-Note-2003-032 | D. Blanc | Process control migration towards LHC ventilation functionality |
ST-Note-2003-033 | M. Battistin | Retendering of ST-CV maintenance contract |
ST-Note-2003-034 | D. Blanc, U. Epting, M.C. Morodo Testa, S. Poulsen |
TCR remote monitoring for the LHC technical infrastructure |
ST-Note-2003-035 | E. Cennini, U. Epting, P.
Ninin, R. Nunes, L. Scibile |
Summary of ST-MA deliverables for LHC |
ST-Note-2003-036 | S. Prodon | Logistique de transport pour le projet LHC : enseignements des premiers secteurs |
ST-Note-2003-037 | C. Colloca, K. Foraz | Planning et coordination de l'installation du LHC |
ST-Note-2003-038 | I. Rühl, A. Calderone | ST-HM equipment consolidation |
ST-Note-2003-039 | G. Gasser | Contribution of thermo-fluid analyses to the LHC experiments |
ST-Note-2003-040 | T. Watson | Outsourced design services lessons learned from LHC civil engineering |
ST-Note-2003-041 | M. Wilhelmsson | Engineering the cooling and ventilation for the LHC |
ST-Note-2003-042 | P. Ninin | "Right-sourcing" or obtaining the correct balance between in-house activity and the purchase of external services |
ST-Note-2003-043 | C. Bertone | ST-HM design section - Strategy and working methods |
ST-Note-2003-044 | P. Alves, M, Nonis, P.
Pepinster, W. van Baaren |
Consolidation on civil engineering and technical infrastructure |
For comments and changes send e-mail to Evelyne.Cochet@cern.ch