CERN-ST Division


6th ST Workshop, Thoiry, France (April 1 - April 3, 2003)
List of presented papers
to be found at  http://weblib.cern.ch


No.

Author(s)

Title

ST-Note-2003-010 N. Bangert Operation and maintenance in the cooling and ventilation group
ST-Note-2003-011 G. Cumer Opératin et maintenance ST-EL : jusqu'où externaliser en conservant la maîtrise ?
ST-Note-2003-012 R. Nunes Operation and maintenance in ST-MA
ST-Note-2003-013 O. Boettcher E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
ST-Note-2003-014 P. Pepinster Operation and maintenance in the FM Group
ST-Note-2003-015 C. Jacot, E. Sanchez-Corral,
L. Symons
L'avis d'ouverture de chantier informatisé : un moyen de prévention et de management
ST-Note-2003-016 C. Colloca Actions for the environment
ST-Note-2003-017 N. Bangert, M. Batz, G. Cumer,
U. Epting, P. Ninin, R. Nunes,
J. Pedersen, P. Pepinster,
S. Poulsen, T. Riesco,
M. Wilhelmsson
The first year of the ST Operation Committee : is there a future ?
ST-Note-2003-018 P. Vojtyla Interaction of TIS and ST in environmental matters
ST-Note-2003-019 M. Pimenta dos Santos Use of fluorocarbons in the cooling of LHC experiments
ST-Note-2003-020 S. Grau, D. Raffourt Nouvelle technologies appliquées à la sécurité
ST-Note-2003-021 D. James The construction and transport of the ATLAS experiment components
ST-Note-2003-022 M. Poehler Réutilisation des demi-culasses d'aimants dipôles du LEP
ST-Note-2003-023 K. Kahle, J. Pedersen
T. Larsson, M.M. de Oliveira / ABB
The new 150 MVAr , 18 kV static var compensator for SPS : background, design and commissioning
ST-Note-2003-024 J. Inigo-Golfin, R. Principe The LHC experiments as seen from the Technical Sector
ST-Note-2003-025 C. Martel, B. Pirollet Organisation des travaux ST-CV
ST-Note-2003-026 H. Rammer, J. Osborne Civil engineering status report for the ATLAS & CMS worksites
ST-Note-2003-027 C. Bertone, S. Pelletier Construction et installation du LHC
ST-Note-2003-028 A. Vairo The organization and on-site follow-up of the electrical installation work for the LHC
ST-Note-2003-029 L.A. Lopez Hernandez Comparaison des procédés d'excavation des tunnels TI8 et TI2 du projet LHC
ST-Note-2003-030 J. Pierlot Modification of the electrical installation in Point 8
ST-Note-2003-031 G. Peon, K. Dahlerup-Petersen,
G.J. Coelingh
Cooling process of the LHC energy extraction resistors
ST-Note-2003-032 D. Blanc Process control migration towards LHC ventilation functionality
ST-Note-2003-033 M. Battistin Retendering of  ST-CV maintenance contract
ST-Note-2003-034 D. Blanc, U. Epting,
M.C. Morodo Testa, S. Poulsen
TCR remote monitoring for the LHC technical infrastructure
ST-Note-2003-035 E. Cennini, U. Epting, P. Ninin,
R. Nunes, L. Scibile
Summary of ST-MA deliverables for LHC
ST-Note-2003-036 S. Prodon Logistique de transport pour le projet LHC : enseignements des premiers secteurs
ST-Note-2003-037 C. Colloca, K. Foraz Planning et coordination de l'installation du LHC
ST-Note-2003-038 I. Rühl, A. Calderone ST-HM equipment consolidation
ST-Note-2003-039 G. Gasser Contribution of thermo-fluid analyses to the LHC experiments
ST-Note-2003-040 T. Watson Outsourced design services lessons learned from LHC civil engineering
ST-Note-2003-041 M. Wilhelmsson Engineering the cooling and ventilation for the LHC
ST-Note-2003-042 P. Ninin "Right-sourcing" or obtaining the correct balance between in-house activity and the purchase of external services
ST-Note-2003-043 C. Bertone ST-HM design section - Strategy and working methods
ST-Note-2003-044 P. Alves, M, Nonis, P. Pepinster,
W. van Baaren
Consolidation on civil engineering and technical infrastructure

 


  Back to ST Division Home page


For comments and changes send e-mail to  Evelyne.Cochet@cern.ch

Copyright CERN , modified 15/12/2003